Reference Documents
(Adobe Reader is required to view the files posted below.)
Deliverables
- Task 5 Replenishment Projections & Task 7.1 Supplemental Water Recharge Capacity (9.48 MB)
Prepared for the Chino Basin Watermaster by Wildermuth Environmental, Inc.
The IEUA’s comments (500 KB) are also available for review. - Task 3 Planning Criteria (365 KB)
Prepared for the Chino Basin Watermaster by Black & Veatch and Wildermuth Environmental, Inc. - 2009 Production Optimization and Evaluation of the Peace II Project Description (7.7 MB)
Prepared for the Chino Basin Watermaster by Wildermuth Environmental, Inc. (November 2009)
Supporting Documents
- Optimum Basin Management Program: Phase I Report (21.8 MB)
Prepared for the Chino Basin Watermaster (August 1999). - Recharge Master Plan Phase II Report (7.51 MB)
Prepared for the Chino Basin Watermaster (August 2001). - 2007 CBWM Groundwater Model Documentation and Evaluation of the Peace II Project Description (65.7 MB)
Prepared for the Chino Basin Watermaster (November 2007) - Special Referee's Final Report and Recommendations on Motion for Approval of Peace II Documents (2.3 MB)
Submitted to the Court December 2007 - Response to Condition Subsequent No. 3 from the Order Confirming Motion for Approval of the... (48.6 MB)
Prepared for the Chino Basin Watermaster (March 2008) - Transmittal of Recharge Master Plan Update Outline (32 KB)
Submitted to the Court August 21, 2008. - Response to Condition Subsequent No. 7 (1.68 MB)
Prepared for the Chino Basin Watermaster (November 2008). - Analysis of Material Physical Injury from the Proposed Expansion of the Dry-
Year Yield Program (24.5 MB)
Prepared for the Chino Basin Watermaster (December 2008).



